Sewage Plant

Water Pollution Control Plant

The Water Pollution Control Plant Department is responsible for the sanitary sewer and storm water system within the Village.

Annual Performance Reports

2023 Point Edward WPCP Annual Performance Report (PDF) 

2022 Point Edward WPCP Annual Performance Report (PDF)

2021 Point Edward WPCP Annual Performance Report (PDF)

Sewage Back-up

Residents are responsible for sewage back-ups that occur as a result of a plugged line from the property line to their house. If the line is plugged on the Village portion of the lateral, or if a sewage back-up occurs for reasons other than plugged lines please call (519) 337-3021. Prompts are provided for reporting after-hours emergencies.

Sewage Rates for 2024

Our current sewage rates are based on water usage:

  • $1.61/m³ for water;
  • $1.10/m³ for sewage; and
  • $1.13/m³ for water and sewage reserves

There is a monthly service charge for water & sewage.

Contact:

Jason Verstraeten, Manager of Environmental Services (519) 339-7273
jverstraeten@villageofpointedward.com